Estimating and Costing
Course Objective:
To provide basic knowledge of estimating and costing of civil engineering works; to analyze the rates and estimate the cost of various construction works.
- Introduction(3 hours)
- Definition
- Estimated Cost and Actual Cost
- Purpose of Estimating
- Principle of Units and Measurement
- Units of Measurement and Payment for Various Items of Works and Materials
- Data Required for Estimating
- Method of Estimating (5 hours)
- Method of Measurements of Building and Civil Engineering Works
- Subheads of Various Items of Works
- Various Methods of Taking Out Quantities
- Abstracting Bill of Quantities
- Preparation of Detailed Estimate: Cost of Items, Contingencies Work charged Establishment
- Types of Estimate (3 hours)
- Approximate Estimates
- Detailed Estimate
- Revised Estimate
- Supplementary Estimate
- Annual Repair and Maintenance Estimate
- Extension and Improvement Estimate
- Complete Estimate
- Split Up of Cost of Building and Road WorksWater Supply and Sanitary Works.
- Analysis of Rates (9 hours)
- Introduction
- Purpose of Rate Analysis
- Importance of Rate Analysis
- Requirement of Rate Analysis
- Factors Affecting the Rate Analysis
- Method of Preparing Rate Analysis for
- building works
- road works
- sanitary and water supply works
- irrigation works
- Project Estimate (5 hours)
- Estimate for a Project
- Report on Estimate
- Estimate for Building Project
- Estimate for Road Project
- Estimate for Irrigation Project
- Estimate for Small Sewerage Project
- Estimate for Water Supply Project
- Detailed Estimate (20 hours)
- Detailed Estimate for a Single Room Load Bearing Frame Structured Building
- Detailed Estimate of a Two Roomed Load Bearing and Framed Structured Building
- Estimate of Earth Work in Road Construction in Plain Area
- Estimate of Earth Work in Road Construction in Hilly Area
- Estimate of Earth Work in Canals
- Estimate for the Construction of Highway for One km Length
- Estimate for Slab Culverts
- Estimate of a Well Foundation
- Estimate of a Pier
- Estimate for T‐Beam Decking
- Estimate for Septic Tank and Soak Pit
- Estimate of an Underground R.C.C. Water Tank
Tutorial:
(15 hours)
- A Double Storied Residential Building
- A Portion of Road Way
- A Portion of Canal with Lining
- Application of Program to Estimate the Quantities of Materials
- Application of Program to Calculate the Volume of Earth Work for a Roadway
- A Residential Toilet
References:
- M. Chakraborti, "Estimating, Costing, Specification and Valuation",
- G.S. Berdie, "Text book of Estimating and Costing (Civil Engineering)",
- A.K. Upadhyaya, "Estimating and Costing".
- Seymour Berger and Jules B. Godel, "Estimating and Project Management for Small Construction Firms"
Evaluation Scheme:
The questions will cover all the chapters in the syllabus. The evaluation scheme will be as indicated in the table below:
Chapter |
Hours |
Marks distribution* |
1 |
3 |
5 |
2 |
5 |
10 |
3 |
3 |
5 |
4 |
9 |
20 |
5 |
5 |
5 |
6 |
20 |
35 |
Total |
45 |
80 |
*Note: There may be minor deviation in marks distribution.
|